CY (Container Yard) Cutoff

What is a CY cutoff date?

A CY cutoff date is the date by which a container must be gated-in (checked-in) at the container yard before its scheduled sailing. CY cutoff dates are determined by the carrier, but are typically 2 days before the scheduled sailing.

Shipment flow diagram: supplier to truck to container yard (crane) to vessel, with a note that CY cut-off is usually 2 days before the sailing date.