# CY (Container Yard) Cutoff

A CY cutoff date is the date by which a container must be gated-in (checked-in) at the container yard before its scheduled sailing. CY cutoff dates are set by the carrier, typically about 2 days before the scheduled sailing.

## What is a CY cutoff date?

A CY cutoff date is the date by which a container must be gated-in (checked-in) at the container yard before its scheduled sailing. CY cutoff dates are determined by the carrier, but are typically 2 days before the scheduled sailing.

![Shipment flow diagram: supplier to truck to container yard (crane) to vessel, with a note that CY cut-off is usually 2 days before the sailing date.](https://cdn.sanity.io/images/ynj1yl20/development/67ea8fbf63fb3fd416b852c56784d41b4e78bfd1-400x281.png)

Back to the [full glossary](https://www.flex.thisisbrew.com/glossary/).

---

*This is a markdown version of [https://www.flex.thisisbrew.com/glossary/container-yard-cutoff-date/](https://www.flex.thisisbrew.com/glossary/container-yard-cutoff-date/) for AI/LLM consumption.*